An engineered swimming pool construction shell, a properly sized plant room and every approval lodged before a digger arrives.
From AED 180,000
FREE VISIT SITE
12 MONTH WARRANTY
MUNICIPALITY APPROVALS LODGED
ENGINEERED RC SHELL
10-YEAR STRUCTURAL WARRANTY
OWN POOL CREW
Swimming pool construction in Dubai attracts contractors who price the tiling and improvise the engineering. Shells are poured without a structural design for saturated ground and hydrostatic uplift, so cracks appear within two seasons. Plant is undersized, so water turns and the owner runs the pump twelve hours a day fighting algae. Balance tanks are omitted, skimmers are set at the wrong level, and the deck falls back toward the coping. Then the municipality inspection fails, and the barrier, drainage and electrical bonding all have to be rebuilt.
We start swimming pool construction with structure and paperwork. A structural engineer designs the reinforced concrete shell for your soil report, water table and pool geometry; the drawings, barrier details, drainage and electrical bonding go to the municipality or community consultant for approval before excavation. Plant is sized to turn the whole volume in under four hours, with a plant room you can actually service. Waterproofing is a warranted tanking system, tiling is fixed on a full bed, and the pool is water-tested and commissioned with balanced chemistry and a written maintenance schedule handed to you.
RC design against soil report, water table and uplift — not a standard detail.
Filtration turning the full volume in under four hours, in a serviceable plant room.
Municipality and community submissions lodged, barriers and bonding compliant.
System waterproofing with a water test before tiling and a 10-year structural warranty.
The written scope of work every contract carries as standard.
01
Plot survey, setback check, service routes and an outline pool layout.
WEEKS 0
02
Structural and MEP design, then municipality and developer submission.
3-6 WEEK
03
Dig, steel, formwork, concrete pour and curing to engineer's specification.
3-4 Weeks
04
Waterproofing, water test, plant room, tiling, coping and deck.
4-6 WEEK
05
Fill, balance chemistry, test all systems and hand over the maintenance schedule.
1 WEEK
Deck materials for swimming pool construction are selected for barefoot surface temperature as well as slip rating — light porcelain and travertine stay usable in July, dark stone does not. Salt systems are specified with compatible fixings throughout.
EMIRATES HILLS
DUBAI
VIEW
PALM JUMEIRAH
DUBAI
VIEW
ARABIAN RANCHES
DUBAI
VIEW
YAS ISLAND
ABU DHABI
VIEW
SAADIYAT ISLAND
ABU DHABI
VIEW
DAMAS HILLS
DUBAI
VIEW
STARTING FROM AED 180,000
STANDARD
PREMIUM
LUXURY
Swimming pool construction pricing depends on volume, edge detail and plant specification. Excavation conditions and the water table can change the shell design, which is why our fixed price follows a site survey and soil review rather than a phone call.
150+ kitchens manufactured in our own workshop
“The approvals were lodged before they broke ground and the inspection passed first time. Two years on there is no cracking and the pump runs four hours a day, not twelve.”
Peter G. · Swimming Pool Construction — Arabian Ranches
Eleven to fifteen weeks on site once approvals are granted, and approvals typically take three to six weeks depending on the community and municipality.
Yes. Municipality approval is required, and gated communities add their own consultant review covering setbacks, barriers, drainage and overlooking. We prepare and lodge both.
Salt systems are gentler on skin and eyes and reduce chemical handling, but need compatible fixings and a slightly larger upfront cost. Both need the same filtration turnover.
Chilling is the more useful of the two here — pools reach the mid-thirties in summer. A heat pump is worth adding if you swim from December to February.
A weekly service contract typically runs from AED 800 to 1,500 per month depending on volume and whether chemicals are included. We hand over a written schedule either way.
Often yes, as a plunge or lap pool, subject to setbacks and access for equipment. Where a digger cannot reach, hand excavation adds cost and time, and we say so at survey.
Ten years structural on the shell, one year on workmanship and finishes, and manufacturer warranties on pumps, filters and heating equipment.
A free site visit anywhere in Dubai or Abu Dhabi, then a written fixed-price quotation within three working days.
PHONE
+971 4 000 0000
+971 5 000 0000
OFFICE HOURS
Sun-Thu 08:00 to 18:00 Sat 09:00 to 14:00